Description: Full report of five full-scale fire tests done on PRG 320-18-compliant CLT.
Description: Full report of five full-scale fire tests done on PRG 320-18-compliant CLT.
Summary report of five full-scale fire tests done on PRG 320-18-compliant CLT.
Predictive modelling for fires in PRG 320-18-compliant CLT and glulam structures.
Time-lapse video is part of a case study of post-fire repair of CLT. The specimen is mechanically tested after the repair.
Report on full-scale fire tests to distinguish façade systems that limit fire spread to an acceptable level from those that do not.
Report presents a case study of the repair of a section of a CLT ceiling after a significant fire.