In early 2016, the ICC Board of Directors approved the creation of an ad hoc committee to explore the building science of tall wood buildings with the scope being to investigate the feasibility of and take action to develop code changes for tall wood buildings. Since that time, the Tall Wood Building (TWB) Ad Hoc Committee has reviewed voluminous materials regarding tall wood buildings, including results of various testing around the world, as well as studies domestically in support of the TWB charge to conduct a thorough review of the science of tall wood. The TWB developed its own test scenario(s) to substantiate any code change proposals (testing was carried out at ATF labs); and worked to develop a comprehensive set of technically-substantiated code changes for consideration during the 2018 Group A code development process. The intensive research performed by the Committee was submitted under the ICC Code Development Process, along with the resulting proposals developed by Committee consensus. All of the Group A TWB proposals have been approved. The TWB has also developed a set of Group B proposals, submitted in January 2019.
Learning Objectives:
Equivalencies: 1.5 Hour of Instruction = 0.15 Continuing Education Units (CEU) = 1.5 Professional Development Hours (PDH) = 1.5 Learning Units (LU)
AWC Standards (STD)
Building Codes (BCD)
Design Considerations (DES)
Green Building (GB)
Materials (MAT)
AIA
ICC
NCSEA
1 Hour
1.5 Hours
2 Hours
2018 NDS
2015 NDS
2012 NDS
2015 SDPWS
2008 SDPWS
2018 WFCM
2015 WFCM
2012 WFCM
Download a Full-Color PDF
Download a Black & White PDF
Watch a Video
View Webinar FAQs
Take an eCourse
Schedule a Live Presentation